Is there a way to restart calculation from WAVECAR after each electronic interation run finished, I am doing hybrid DFT-HF calculation, at static calculation step, the job can not finish in a fixed time. I was starting from a WAVECAR file got from the DFT converged calculation, and set the 'LWAVE = .TRUE.' in my hybrid HF-DFT job, but the WAVECAR did not change if the electronic iteration can not converge.

If the WAVECAR could be wroten after some electronic interations, then I could continue the hybrid DFT-HF static run from WAVECAR, does anybody could help at this? Thanks.

Re: how to write WAVECAR in unfinished static calculation in order to restart

Posted: Tue Sep 10, 2024 2:18 pm
by support_vasp

Hi,

We're sorry that we didn’t answer your question. This does not live up to the quality of support that we aim to provide. The team has since expanded. If we can still help with your problem, please ask again in a new post, linking to this one, and we will answer as quickly as possible.

Best wishes,